Bathroom Shower and Leak Repairs
- Location
Hobson Street, Stockport
Client Feedback
“The bathroom repairs were completed neatly and professionally. The shower fittings were replaced, the screen was secured, the tiles were regrouted and the toilet was resealed to prevent further movement and leakage.”

Bathroom Shower and Leak Repairs — Hobson Street, Stockport
Project Overview
British Builders attended a property on Hobson Street in Stockport to complete bathroom remedial repairs following reported leakage issues and defective installation works.
The bathroom required a coordinated repair visit covering shower fittings, the shower screen, tiled grout lines and toilet pan movement. The works were completed as a wider leak-prevention and finishing package rather than a small isolated repair.
New compatible shower fittings were supplied and installed, including a shower hose, handset and mixer connection. A new shower screen was fitted and sealed, affected tile joints were regrouted, and the toilet pan was secured and resealed to reduce movement and help prevent future leakage.
Scope of Work
- Inspection of bathroom leak and defective installation areas
- Removal of existing shower assembly where required
- Supply and installation of new shower hose, handset and mixer fittings
- Securing, sealing and testing of shower fittings
- Supply and installation of new shower screen
- Positioning, fixing and sealing of shower screen
- Removal of defective or incomplete grout from affected tiled areas
- Regrouting of tile joints to improve finish and water resistance
- Inspection, refitting and securing of toilet pan
- Resealing around the base of the toilet pan
- Final water testing, clean-down and minor waste removal
Challenges & Solutions
- Leakage issue — The works addressed both visible water escape points and poor finishing.
- Defective shower fittings — New compatible hose, handset and mixer components were fitted and tested.
- Water escaping from shower area — A new shower screen was positioned and sealed to improve containment.
- Incomplete grout — Affected grout lines were removed and renewed for better water resistance.
- Toilet pan movement — The toilet was refitted, secured and resealed at the base.
Final Outcome
The bathroom remedial repair works were completed successfully.
The defective shower fittings were replaced, the new shower screen was fitted and sealed, and affected tiled areas were regrouted. The toilet pan was also secured and resealed to reduce movement and improve protection around the WC area.
The bathroom was left cleaner, more functional and better protected against further water escape, with all visible repair areas checked before completion.
Client Feedback
“The bathroom repairs were completed to a good standard. The shower fittings were replaced, the new screen was fitted securely, the tiles were regrouted and the toilet was resealed.” – Property Client